Positive Lifting was hired to install a construction elevator hoist at an active building site in New York City.
Using a knuckleboom crane, our team carefully lifted and positioned the hoist track system along the building facade - working within a tight urban job site with limited space and full crew coordination.
The installation was completed safely and efficiently, keeping the project on schedule.

Elevator hoist Installtion