NYC safest and fastest permit approvals by Positive Lifting

Need NYC Crane Permits or Rigging Approvals? We've Got You Covered.

Navigating the world of NYC crane permits and rigging approvals is no easy task. Between the DOB, DOT, MTA , FDNY, NYPD and all government agencies there’s a maze of paperwork, inspections, and approvals that can bring your project to a standstill.

At Positive Lifting, we simplify it all.

With over 20 years of experience in New York City’s most complex lift operations, we handle every aspect of permitting - so your job stays legal, on schedule, and stress-free.



Full Permit Package Example - 1477 3rd Avenue

Below is a complete, real-world example of a DOB-approved knuckleboom permit package we secured for a project at 1477 3rd Avenue, Manhattan- including the approved engineering plan and the official work permit issued under the same application number (M08025206). This gives you a clear picture of the full scope of documentation we manage on your behalf, from initial engineering drawings to final DOB approval.

NYC DOB PMM Permit Requirements for Knuckle Boom Cranes (Articulating Boom Cranes)

NYC DOB PMM Permit Requirements for Knuckle Boom Cranes (Articulating Boom Cranes) NYC DOB PMM Permit Requirements for Knuckle Boom Cranes (Articulating Boom Cranes)

Onsite Authorization

Onsite Operation Certificate - 335 Bowery

Official NYC Department of Buildings (DOB) permit for mobile crane operations at 335 Bowery, Manhattan.

Onsite Authorization-Onsite Operation Certificate-335 Bowery

Engineering Plans

Site Logistics & Crane Placement Plan

Detailed site logistics plan showing crane positioning and operational footprint at 622 11th Avenue.

Engineering Plans-Site Logistics & Crane Placement Plan

Crane Swing & Radius Chart

Engineering diagram illustrating the full swing radius and operational reach for site safety management.

Engineering Plans-Site Logistics & Crane Placement Plan

Safety Protocols

Wind Action Safety Plan - Part 1

Standard operating procedures and safety thresholds for crane operations during high-wind conditions.

Engineering Plans-Site Logistics & Crane Placement Plan

Wind Action Safety Plan - Part 2

Extended safety protocols and securing procedures for equipment during severe weather alerts.

Engineering Plans-Site Logistics & Crane Placement Plan

Engineering Certification

Engineer of Record (EOR) Structural Certification

Official certification letter from the structural engineer confirming the building's capacity to support crane loads.

Engineering Certification-Engineer of Record (EOR) Structural Certification

Our NYC Crane Permit & Rigging Services

We take full responsibility for working with every city agency - so you don’t have to.
Our comprehensive services include:

  • Crane Permit Filing & DOB Approvals

    From engineered drawings to final DOB sign-off, we handle the entire crane permit process. Our team ensures your lift is fully compliant with city codes - the first time.

  • DOT & NYPD Street Closures

    Need to close a lane, sidewalk, or restrict parking? We secure all required DOT and NYPD permits for safe, legal street operations.

  • Multi-Agency Coordination

    We coordinate inspections, approvals, and field operations with DOB, FDNY, DOT, and NYPD - eliminating friction, delays, and miscommunication.

  • Site Safety Plans (SSP) & Traffic Control

    Our in-house safety experts design detailed DOB-compliant Site Safety Plans, traffic flow diagrams, detour routes, and logistics tailored to your project.

  • Permit Modifications & Emergency Support

    Conditions change fast - and so do we. Our team is ready to revise permits, respond to on-site issues, and expedite re-approvals when the unexpected hits.

Agency-Specific Certifications

  • LIRR (Long Island Rail Road)

    Certified and qualified to perform crane and rigging operations under LIRR standards, including safety procedures unique to rail infrastructure.

  • PATH (Port Authority Trans-Hudson)

    We’re approved by the Port Authority to handle lifting and rigging projects near PATH infrastructure, with full understanding of their operational protocols.

  • CSX Transportation

    Positive Lifting is certified to perform crane services on CSX projects, following their strict logistical and safety requirements.

Specialized Permits & Approvals

  • Bike Lane Approvals

    We secure authorizations for any lift work affecting existing bike lanes - including detours and safe cyclist routing.

  • MTA / Transit Authority Impact Approvals

    We manage MTA-related approvals for all work within or adjacent to transit property. Includes both “Impact” and “No Impact” documentation.

  • NYC DOT Crane and Boom Occupancy Permits

    Whether for full or partial street closures, we file for all crane/boom-related roadway and sidewalk use - including FRC and PRC.

  • After-Hours Variance (AHV) Approvals

    Working nights or weekends? We obtain DOB authorization for all after-hours lift work.

DOB CN (Crane Notice) Permits

We offer full-service CN permit management - a requirement for any crane operation in NYC.
Our DOB CN Services include:

  • Crane Notice Permits for mobile, tower, and crawler cranes
  • DOB-stamped drawings
  • Agency coordination and compliance
  • Expedited approvals and amendments
  • Permit renewals when needed
  • Job-specific regulatory support for cranes exceeding 250 ft or 300 ft

Your crane stays certified, approved, and ready for action - fully compliant with DOB Cranes & Derricks.

PE-Stamped Engineering - Signed & Sealed

Our engineering team prepares all required plans and documents, signed and sealed for DOB approval.
Engineering packages include:

  • Critical Lift Plans
  • Rigging Plans & Configurations
  • Wind Action & Safety Plans
  • MPT (Maintenance & Protection of Traffic) Submissions
  • Site-Specific Load Calculations
  • Route Surveys & Ground Bearing Certifications
  • Geotechnical Reports

From concept to filing - we engineer every detail so you can lift with confidence.

Why Choose Positive Lifting?

Choosing the right partner for NYC crane permitting makes all the difference. Here’s why top contractors trust Positive Lifting:
20+ Years of NYC Experience - We’ve built trusted relationships with DOB, DOT, and FDNY.

Faster Approvals - We know the system — and how to work within it.

100% Compliance Assurance – Avoid violations, delays, and fines.

One Point of Contact - Permits, safety, logistics — all handled by one expert team.

Responsive Service - Speak directly with professionals who understand NYC construction timelines.

Projects We Support

We provide crane permit management and rigging approvals for:
High-rise construction & tower cranes

Equipment hoisting & façade installations

HVAC units, generators, steel beams & more

Weekend and night operations

Emergency lifts requiring expedited permits

NYC Crane Permit FAQs

How long does it take to get a crane permit in NYC?

It depends on project scope and agency workload - but our expertise and relationships often mean faster approvals than average.

Can you help with night or weekend crane lifts?

Absolutely. We specialize in off-hours permitting, including traffic and pedestrian control plans.

Why not file permits myself?

NYC’s permitting system is complex and constantly changing. One error can lead to thousands in fines or days of delay. We eliminate those risks so you can focus on building.